Work completed during 8th – 9th August 2011

Wramplingham    The Street and Wymondham Road 

  • Siding out of edge of carriageway approx 200 m
  • Siding out of footway approx 15 m
  • Trim back hedge approx 25m
  • Hand sweep carriageway in channel  approx 165 m
  • Hand sweep full carriageway approx 16m
  • Hand sweep footway full width 85m
  • Clean existing Gully  3No
  • Rod and flush by hand 7 No
  • Wash signs 3 No
  • Wash reflective posts  39 No

 Barford   Colton Road,  Church Lane, Chapel Street and Cock Street

  •  Trim Hedge  100 m
  • Wash signs 3 No
  • Strimming Grass 89m
  • Siding out carriageway 54 m
  • Fill pothole 2m2
  • Clean out gully 4 No
This entry was posted in August 2011. Bookmark the permalink.

Comments are closed.